Hello GL Theatre Crew!
We are starting the build for the Spring Musical (finally...)
We have a very short build time due to the theatre use schedule.
Because of that, we are going to adapt what we have in stock (for the most part).
We will be painting right away and beginning to build a Plane, Murphy bed, and refrigerator.
The walls will be built from flats the already exist but must be repainted.
Our biggest issue is that we need to be off the stage up to a few weeks before the show.
Because of this, we will be doing as much as possible before we actually build.
We will have to paint the flats that we plan on using before we install them. Once installed there will be a lot of finish work and touchup needed.
We will be beginning to build on Thursday 2/18 at 630pm. ** Bring painting clothes **
-RILEY